61
PARTS REQUIRED:
EAVE SIDE SOFFITS
Place
96"
soffit board primed side down, flush to gable trim unit and rafter ends
(Fig B)
.
Secure with 2" finish nails, (2) in each rafter and (2) into edge of
AO
as shown.
Position
73-1/2"
soffit board primed side down flush to gable trim unit and rafter ends
(Fig B)
.
Secure with 2" finish nails, (2) in each rafter.
Repeat steps to install eave nailer and soffit boards on the opposite side.
2
3
Your
eave nailer and soffit boards are now installed
.
FINISH
Primed Side Down
2" (5,1 cm)
Finish Nails
Flush to
gable trim
unit
Flush to
gable trim
unit
Flush at
seam
4-7/8" x 73-1/2"
4-3/4" x 96"
AO
Flush
Fig. B