12
FINISH
LEVEL AND SQUARE FLOOR FRAME
Before installing floor decking, it is important to level and square the floor frame.
A level and square floor frame is required to correctly construct your shed.
BEGIN
2
3
1
Use level and check the frame is level before applying floor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 193-1/2" (491,5 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one
fastener at ends of each runner making sure the frame remains square
(Fig. A)
.
Once the floor frame is level and square, fasten the frame to the 4x4 runners at each point where
the frame contacts the 4x4 runners.
See page 9 for the preferred floor leveling method.
First, secure
at ends with
one fastener.
Second, secure
at ends with
one fastener.
193-1/2"
(491,5 cm)
193-1/2"
(491,5 cm)
Fig. A
DOU
BLE
DOO
R
SINGLE
DOOR