46
GABLE UNITS
PARTS REQUIRED:
3" (7,6 cm)
x4
x2
Gable Units
Set gable unit on top plate
SZ
.
BE SURE GABLE UNIT IS CENTERED ON WALL BEFORE NAILING.
Hold gable unit secure with (1) 2" nail on each side
Continue nailing lower edge of panels into top plate with 2" nails spaced 6" apart, as shown
1
BEGIN
Install both gable units the same on both gable walls. Measure 2-9/16" down from top plate and mark
at each side as shown
(Fig A)
.
You have finished installing your gable units.
FINISH
2" (5,1 cm)
x40
PVA
3"
(7,6 cm)
Screws
Fig. B
TOP PLATE (SZ)
SZ
3"
(7,6 cm)
Screws
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
6"
(15,2 cm)
Fig. A
TOP PLATE
2-9/16"
(6,5 cm)
Measure and
Mark
2-9/16"
(6,5 cm)
Measure and
Mark
On the inside, secure gable unit with 3" screws angled into
SZ
at an angle as shown in
(Fig. B)
.
2
3