![background image](http://html1.mh-extra.com/html/backyard-products/gambrel/gambrel_assembly-manual_3349556038.webp)
36
CORNER TRIM
x32
2" (5,1 cm)
Install (2) 1-3/4" x 45-3/8" vertical battens on the front of shed. Battens are flush to the outside of side wall
battens
(Fig. A)
and flushed up to bottom of gable trim.
Secure with 2" finishing nails spaced 6" apart. Nail into interior framing.
Repeat steps for the opposite side.
Your corner trim is now installed.
FINISH
1
BEGIN
PARTS REQUIRED:
2" (5,1 cm)
Finishing
Nails
x4
3/8 x 1-3/4 x 45-3/8" (1,0 x 7,6 x 115,3 cm)
6"
(15,2) cm)
45-3/8"
115,3 cm)
Fig. A
Flush
Side
Batten
Interior
Framing
Flush
Flush