![background image](http://html1.mh-extra.com/html/backyard-products/gambrel/gambrel_assembly-manual_3349556024.webp)
22
PARTS REQUIRED
2" (5,1 cm)
x27
3" (7,6 cm)
x12
RIGHT SIDE WALL INSTALLATION
Secure lower edge of panels to floor frame with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. A)
.
Secure side wall bottom plates to floor with 3" nails
(Fig. A)
.
2
Your right side wall is now installed.
FINISH
3" (7,6 cm)
x2
Center right wall on the floor.
Ensure the 1" overlap is to the bottom.
Install
OO
as a temporary brace.
Secure with (2) 3" screws.
BEGIN
1
Angle nails into
floor frame.
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A
OO
x2
69" Door Stiffener (175,3 cm)
Temporary Support
3" (7,6 cm)
Screws
OO
DOOR
1"
(2,5 cm)
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails