12
Ensure the floor frame is level after installing floor panels.
Re-level if necessary.
• The floor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process
to avoid over-handling of the walls.
HINT:
IMPORTANT!
SIDE WALL
SIDE WALL
FRONT WALL
DOOR
BACK WALL