25
Fig. B
Angle nails
into floor
frame.
3" (7,6 cm)
Screws
2
Secure bottom of panels to floor with
2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. B)
.
3
Secure front wall panels to side wall studs
with 1-1/2" nails spaced 6" apart.
Working inside, secure back side of door
studs to floor with 3" screws angled nto
floor frame.
Your front wall is now installed.
Remove temporary brace.
FINISH
FRONT WALL INSTALLATION
2" (5,1 cm)
x8
x14
1-1/2" (3,8 cm)
PARTS REQUIRED:
2" (5,1 cm)
x4
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
Fig. A
2" (5,1 cm)
Screw
Flush
2" (5,1 cm)
Screw
Flush
Flush
Install front wall between left and right walls.
Secure wall with 2" screws into each side wall
top and bottom plates
(Fig. A)
.
1
ENSURE PANEL CORNERS ARE FLUSH.
BEGIN
6"
(15,2 cm)
6"
(15,2 cm)
6"
(15,2 cm)
3" (7,6 cm)
x2
1-1/2"
(3,8 cm)
Nails