34
GABLE TRIM
x40
2" (5,1 cm)
Your gable trim is now installed.
FINISH
1
BEGIN
2
Position upper trim
WHX
as shown. Match black ends at peak.
Ensure top of
WHX
are flush to top of OSB roof panels.
Secure with 2" finishing nails spaced evenly.
Flush lower trim
DBR
with
WHX
and top of OSB roof panels. Match red ends.
Secure with 2" finishing nails spaced evenly.
Repeat steps for the opposite side of shed.
PARTS REQUIRED:
Hint: Pre-set nails in trim
before final installation.
SPACED EVENL
Y
Flush with top
of OSB roof
panels
Flush
Flush at peak.
Flush at seam
Flush at seam
2" (5,1 cm)
Finishing Nails
MATCH BLACK ENDS
ZHL
ZHR
DBL
DBR
x2
2 x 4 x 36-3/4" (2,5 x 10,26 x 93,3 cm)
DBL
x2
2 x 4 x 36-3/4" (2,5 x 10,26 x 93,3 cm)
DBR
x2
2 x 4 x 35-3/4" (2,5 x 10,26 x 90,8 cm)
ZHL
x2
2 x 4 x 35-3/4" (2,5 x 10,26 x 90,8 cm)
ZHR
MATCH GREEN ENDS
MATCH RED ENDS