background image

16913

!

24/7 Support

help.backyardproducts.com

Business Hours

(734) 242-6900

Answers to frequently 
asked questions

Monday - Friday ........... 8:00am - 6:00pm EST
Saturday - Sunday .................................Closed

Technical assistance and 
how-to videos

Submit a help request

Request replacement parts

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

flow

c

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

STOP

DO NOT RETURN

   

TO THE STORE!

If you discover missing or damaged parts,

or if you have questions about the building process,

please reach out to us directly for the fastest service.

Summary of Contents for GAMBREL

Page 1: ...your shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he flowcode to apply t o d a y IN...

Page 2: ...C Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and of...

Page 3: ...ontact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods a...

Page 4: ...Level q Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...x 88 9 cm x3 NE 2 x 3 x 45 1 2 5 1 x 7 6 x 115 6 cm x1 EH 2 x 3 x 51 5 1 x 7 6 x 129 5 cm x14 AFE 2 x 3 x 44 5 1 x 7 6 x 111 8 cm x4 3 8 x 1 3 4 x 72 3 8 1 0 x 7 6 x 186 4 cm x8 3 8 x 1 3 4 x 45 3 8...

Page 6: ...8 1 x 121 9 x 121 9 cm x1 x1 x1 LEFT DOOR x1 RIGHT DOOR x2 7 16 x 35 3 8 x 48 1 1 x 89 9 x 121 9 cm x2 7 16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm x2 7 16 x 11 7 8 x 48 1 1 x 30 2 x 121 9 cm 7 16 x 35 3...

Page 7: ...WARE BAG DOOR HARDWARE 2 5 1 cm 1 1 2 3 8 cm 3 7 6 cm 2 5 0 cm 1 1 4 3 2 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 1 2 5 cm x8 4 screws in each package Spring Bolt x44 3 4 1 9 cm x1 T D Handle x2 1 1 2 3 8...

Page 8: ...D WOOD FLOOR FRAME OPTIONAL FOUNDATION OR FLOOR MATERIALS ADDITIONAL MATERIALS IMPORTANT Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor jo...

Page 9: ...e gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see page 7 CONCRETE Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 40 3 sc...

Page 10: ...k beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements Treated Sill Plate...

Page 11: ...FRAME Look for Stamp TREATED HINT For easier nailing stand on frame Arrange parts as shown on a flat surface Measure and mark Secure with 2 3 nails at each mark Your floor frame is now assembled Proce...

Page 12: ...s by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 173 1 16 439 6 cm When the frame is level and square secure...

Page 13: ...rt on edges and 12 apart inside panels 3 4 Gauge Block 3 4 Gauge Block 3 4 Gauge Block For squareness maintain 3 4 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 6 15 2 cm 12 30 5 cm Flu...

Page 14: ...panels Re level if necessary The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT...

Page 15: ...uaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 G...

Page 16: ...NE x3 BACK WALL 1 BEGIN PARTS REQUIRED Arrange parts on the flat side on a flat surface Measure and mark Secure parts with 3 screws angled Pre drill all holes 3 7 6 cm x4 x3 NE 2 x 3 x 45 1 2 5 1 x 7...

Page 17: ...Secure panel to horizontal brace with 4 1 1 2 nails spaced evenly 3 2 Ensure panel edge is 1 1 4 centered on the center brace NE Secure panel with 1 1 2 nails spaced 6 apart Ensure end wall brace NE...

Page 18: ...r brace with 1 1 2 nails spaced 6 apart Ensure end wall brace is 2 1 2 from the panel edge Secure with 1 1 2 nails spaced 6 apart 6 15 2 cm 5 7 BACK WALL PANELS PARTS REQUIRED x21 1 1 2 3 8 cm x1 3 8...

Page 19: ...N with 1 1 2 nails spaced 6 apart Install gable panels with the primed side facing up 1 1 4 3 2 cm Lay BSN on the flat side Install left gable panel on BSN at measurements shown Secure with 1 1 2 nail...

Page 20: ...3 7 6 cm x32 HINT For easier nailing stand on frame BEGIN 1 Arrange parts on edge on floor as shown Measure and mark Secure with 2 3 nails at each connection and 4 3 nails angled at seams NK NK PT PT...

Page 21: ...e top plate Use the gauge block for consistent measurement on the wall stud Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Install 2 48 x 48 panel flush to the top pla...

Page 22: ...FRONT WALL PARTS REQUIRED HINT 3 7 6 cm x6 x1 DT 2 x 3 x 11 3 4 5 1 x 7 6 x 29 8 cm x1 EH 2 x 3 x 51 5 1 x 7 6 x 129 5 cm x2 OZ 2 x 3 x 70 1 4 5 1 x 7 6 x 178 4 cm EH OZ OZ DT Flush Flush 3 7 6 cm Nai...

Page 23: ...r door frame Maintain 1 2 along door stud before nailing Secure the panel with 2 nails spaced 6 apart along edges Secure panel to gable connector DT with 1 1 2 nails as shown Install 2nd front wall pa...

Page 24: ...oor with 3 nails Fig A 2 Your right side wall is now installed FINISH 3 7 6 cm x2 Center right wall on the floor Ensure the 1 overlap is to the bottom Install OO as a temporary brace Secure with 2 3 s...

Page 25: ...to floor with 2 nails spaced 6 apart Angle nail to hit floor frame Fig B 3 6 15 2 cm Flush Fig B 2 5 1 cm Nail Angle nail to hit floor frame 6 15 2 cm 1 1 2 3 8 cm Nails BEGIN 2 5 1 cm Screw Flush 2...

Page 26: ...to top plate and 1 2 screw into the floor frame Fig A 2 Secure bottom of panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig B 3 6 15 2 cm Fig A BEGIN 2 3 8 cm Screw 2 5 1 cm...

Page 27: ...with 3 screws angled nto floor frame Your front wall is now installed Remove temporary brace FINISH FRONT WALL INSTALLATION 2 5 1 cm x8 x14 1 1 2 3 8 cm PARTS REQUIRED 2 5 1 cm x4 2 5 1 cm Screw 2 5 1...

Page 28: ...cure gusset to trusses with 12 2 nails in pattern shown Fig B Hold trusses tight at peak when nailing Install one gusset on TWO rafters Fig C With FIVE of the rafters flip rafters over and attach a SE...

Page 29: ...h 1 3 screw at truss end Fig A Fig B Repeat steps for the opposite side of shed You have finished installing your rafters Fig A 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm RAFTERS PARTS REQU...

Page 30: ...apart Secure front wall gable panels to front rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws screwed into BSN at an angle Fig A Continue securing panels to rafter...

Page 31: ...ls in the corners as shown Measure down from corner of front and back rafters to 23 7 8 Fig A Snap a chalk line across rafters ROOF PANELS Roof panels may cause serious injury until securely fastened...

Page 32: ...Secure with 2 nails at seam 5 From outside of panel edge 3 4 GAUGE BLOCK GAA 7 16 x 35 3 8 x 96 1 1 x 89 9 x 243 8 cm x1 Two Nails 35 3 8 x 96 3 4 1 9 cm Gauge Block Fig B Install 1 35 3 8 x 96 roof...

Page 33: ...2 2 nails in the bottom corners Two Nails Flush Flush 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 3 8 61 9 cm 2 5 1 cm Nails Maintain the spacing between the center of the rafters at the upper edge of the...

Page 34: ...ls Lower edge of panel will overhang Fig E Use the 3 4 gauge block GAA to center panel with a 3 4 measurement on the rafter Secure panel with 2 2 nails in the bottom corners Install 1 11 7 8 x 48 roof...

Page 35: ...ROOF PANELS Your roof panels are now installed 2 5 1 cm PARTS REQUIRED x144 Secure all roof panels with 2 nails spaced 6 apart on edges and 12 apart inside panel Repeat steps to install roof panels o...

Page 36: ...with 2 finishing nails spaced evenly Repeat steps for the opposite side of shed PARTS REQUIRED Hint Pre set nails in trim before final installation SPACED EVENLY Flush with top of OSB roof panels Flu...

Page 37: ...de wall and flush with outside of front and back wall panels Fig A Secure with 2 finishing nails spaced 6 apart Repeat steps for the opposite side Your side trim is now installed FINISH 1 BEGIN 2 PART...

Page 38: ...flushed up to bottom of gable trim Secure with 2 finishing nails spaced 6 apart Nail into interior framing Repeat steps for the opposite side Your corner trim is now installed FINISH 1 BEGIN PARTS REQ...

Page 39: ...eft Door Right Door BEGIN 1 DOORS 2 Fasten temporary support OO with 3 screws in middle and at ends Fasten temporary support GAA with 2 1 1 4 screws OO GAA OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm 3...

Page 40: ...floor frame Fig C Fig D Angle 3 7 6 cm Screw Install temporary support OO flush under wall panels for doors to rest on Secure with 2 3 screws Fig A x12 O O Flush under panel Fig A O O Center doors in...

Page 41: ...INISH BEGIN 2 1 3 4 1 9 cm Center trim ZB over doors and secure with 2 finishing nails into framing as shown Reinforce the door trim with 3 4 screws through door panel into trim Fig A Locate screws as...

Page 42: ...1 PARTS REQUIRED x14 2 5 cm DOOR STIFFENERS FINISH On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO with 7 2 screws thro...

Page 43: ...C 1 1 2 3 8 cm Screws SET SCREW Your your door handle is now installed Re drill hole with 1 2 drill Fig A Keep drilled hole square to trim to avoid breaking edge of 1 1 4 x 2 1 2 door stiffener Measu...

Page 44: ...op is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B PARTS REQUIRED SPRING BOLTS x2 5 16 0 8 cm Drill Bit Your spring bolts are now ins...

Page 45: ...opposite side walls 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7 6 12...

Page 46: ...lic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Note Prime a...

Page 47: ...of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge Be...

Page 48: ...ling Look for either of the following If the rain slot of the shingle installed over the bend is ABOVE the bend and 3 to 4 of it overhangs down over the bend continue shingling up to the peak You have...

Page 49: ...own below If shingles overlap at ridge cut to peak with a utility knife Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim...

Page 50: ...es Hint Use cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1...

Page 51: ...e sure there is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have fin...

Page 52: ...1 4 X 48 RIGHT K 48004204144 1 Left Back Gable 3 8 NG 42 1 4 X 48 LEFT K 48004204244 1 Back Side Wall Panel SIDING NG 4 X4 11504 8 Horizontal Battens 3 8 NG 1 3 4 X 72 3 8 K 72060112000 4 Side Front...

Page 53: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: