background image

16432

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-888-827-9056

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 7:00 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

STOP!

STOP!

PART 1

Summary of Contents for GAMBREL 12' x 12'

Page 1: ...formation call our toll free number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 7 00 PM EST Saturday 8...

Page 2: ...This page intentionally left blank...

Page 3: ...to level your shed are listed on page 10 CHECK ALL PARTS Inventory all parts listed on pages 5 8 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for require...

Page 4: ...ly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best...

Page 5: ...x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm hot dipped galvanized nails 2 x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10...

Page 6: ...Drip Edge Feet 15 Roofing Felt Sq ft to cover 1 Galvanized Roofing Nails lbs For roofing felt 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm x2 x2 x2 x3 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 l...

Page 7: ...t stamp WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm RS RS...

Page 8: ...m x12 FASTENER HARDWARE BAG Shown Actual Size PANEL DOORS PARTS LIST x1 x1 ROOF PANELS NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail mus...

Page 9: ...2 1 5 x 6 3 x 182 9 cm OO x2 69 175 3 cm Door Stiffener MDL x2 19 32 x 2 1 2 x 39 7 8 1 5 x 6 3 x 101 3 cm AH x2 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 7 cm DOOR HARDWARE 3 4 1 9 cm x8 x2 x1 x2 x2 1 2...

Page 10: ...10 2 x 121 9 cm SX x2 2 x 4 x 60 5 1 x 10 2 x 121 9 cm SX x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x8 x4 x8 2 x 4 x...

Page 11: ...7 cm 12 x20 304 8 x 609 6 cm 12 x24 304 8 x 731 5 cm 144 365 8 cm 203 5 8 612 3 cm 192 487 7 cm 240 609 6 cm 288 619 8 cm 240 609 6 cm 279 7 8 710 6 cm 322 817 9 cm 12 x 12 Building Requires 12 x 16 B...

Page 12: ...METHODS MATERIAL REQUIRED TREATED LUMBER 4 x 4 x 12 10 2 x 10 2 x 304 8 cm 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 1 4 x 4 x 12 10 2 x 10 2 x 144 cm cut to 3 4...

Page 13: ...r at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at the ends of each runner ensuring that the frame remains square Fasten the frame to the 4x...

Page 14: ...ure during the build process to avoid over handling of the walls HINT D O O R NOTE 12 x 12 Gambrel shown standard throughout manual Ensure the floor frame is level after installing floor panels Re lev...

Page 15: ...13 This page intentionally left blank...

Page 16: ...ing pages 01 01 02 01 01 02 03 03 02 02 03 02 02 02 03 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 04 07 10 12 16 13 17 14 18 15 19 09 11 05 06 04 07 07 12 16 12 16 12 16 12 16 08 08 04 04 V 1 V 2 V...

Page 17: ...2 walls 12 12 x 24 Door is on the 12 wall Wall 01 Page 18 Wall 02 Page 20 Wall 16 Page 48 build 2 walls 16 12 x 16 V 2 Door is on the 16 wall offset right Wall 02 Page 20 Wall 07 Page 30 Wall 10 Page...

Page 18: ...1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN...

Page 19: ...posite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84...

Page 20: ...2 x 199 4 cm AI TP UM UM TP SP SP AI x6 AL x5 Flush Flush Flush Flush Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header...

Page 21: ...x166 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary B...

Page 22: ...cm PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI AI x7 SP TP SP TP 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each conn...

Page 23: ...all 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orienta...

Page 24: ...cm PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI AI x7 SP TP SP TP 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each conn...

Page 25: ...from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 1 48 x 8...

Page 26: ...1 x 10 2 x 235 cm TJ x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC PARTS REQUIRED YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each...

Page 27: ...and 12 inside panel Note the panel lip edge square edge orientation 2 Install next 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart...

Page 28: ...sembled Header x5 2 x 4 x 7 5 1 x 10 2 x 17 8 cm AL x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI TJ UM UM HVC YFA YFA AI x4 AL x5 Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measur...

Page 29: ...15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 11 7 8 x 8...

Page 30: ...Assembled Header TJ UM UM HVC YFA YFA AI x4 AL x5 Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig A Secur...

Page 31: ...LL 06 WITH DOOR 2 5 1 cm x129 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener O...

Page 32: ...nt parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 EAVE WALL 07 3 7 6 cm x72 PARTS REQUIRED AI x7 TJ SP SP YFA YFA HVC Sea...

Page 33: ...with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 3 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Sec...

Page 34: ...nt parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 EAVE WALL 08 3 7 6 cm x36 PARTS REQUIRED AI x7 TJ SP SP YFA YFA HVC Sea...

Page 35: ...panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 and 2 23 7 8 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart o...

Page 36: ...Assembled Header TJ SP UM UM HVC YFA YFA SP AI x6 AL x5 Flush Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown...

Page 37: ...1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 84 panel flush...

Page 38: ...Header TJ UM UM HVC YFA YFA SP AI x6 AL x5 Flush Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig...

Page 39: ...orary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 23 7 8 x 84 and 1 48 x 84 panels flush to installed panels and 1 1 2 fro...

Page 40: ...embled Header TJ SP UM UM HVC YFA SP YFA AI x6 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as show...

Page 41: ...1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 8...

Page 42: ...HINT 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 20 EAVE WALL 12 3 7 6 cm x44 PARTS REQUIRED AI x9 TJ TP T...

Page 43: ...d 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 4 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails s...

Page 44: ...x1 Pre Assembled Header TJ TP UM UM HVC YFA YFA TP AI x8 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Hea...

Page 45: ...h OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top...

Page 46: ...1 Pre Assembled Header TJ TP UM UM HVC YFA TP YFA AI x8 AL x5 Flush Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled...

Page 47: ...2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 3 48 x 84 panel flush t...

Page 48: ...x1 Pre Assembled Header TJ TP UM UM HVC YFA TP YFA AI x8 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Hea...

Page 49: ...cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 3 48 x 84 panel flush to installed panels and 1 1 2...

Page 50: ...HINT 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 24 EAVE WALL 16 3 7 6 cm x56 PARTS REQUIRED AI x11 SP TP...

Page 51: ...sh Flush Flush SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE 1 1 2 3 8 cm 3 1 2 8 9 cm Install 1 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure...

Page 52: ...6 x1 Pre Assembled Header TJ TP SP UM UM HVC SP YFA TP YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient...

Page 53: ...r Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip e...

Page 54: ...6 x1 Pre Assembled Header TJ TP SP UM UM HVC SP YFA TP YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient...

Page 55: ...8 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation Flush Flush Fl...

Page 56: ...x1 Pre Assembled Header TJ TP SP UM UM HVC SP TP YFA YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Ori...

Page 57: ...r Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip e...

Page 58: ...mension 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to...

Page 59: ...nd top plate Fig B Secure wall to bottom plate first 1 ENSURE PANEL CORNERS ARE FLUSH Your 12 eave wall 04 is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 1 1 2 3 8 cm...

Page 60: ...or frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall wi...

Page 61: ...ail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING...

Page 62: ...SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates HVC TJ TJ SP PT SP PT 3 7 6 cm Nails...

Page 63: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Page 64: ...to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 16 eave wall 07 is now instal...

Page 65: ...lace 2nd 16 wall centered on floor The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1...

Page 66: ...Nail 16 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 16 07 or 08 wall is now installed FINISH 1 1 2 3 8 cm x13 Secure gable wall top plate with 1 3 screw at the corner at an an...

Page 67: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Page 68: ...every 24 Fig A 2 Secure from bottom with 2 3 screws at each corner Fig B Fig B 3 7 6 cm Screws Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm NK x2 2 x 4 x 44 3 8 5 1...

Page 69: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Page 70: ...to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 20 eave wall 12 is now ins...

Page 71: ...floor 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x2 x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2 3...

Page 72: ...4 Secure 20 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 20 wall 12 is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as s...

Page 73: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Page 74: ...spaced every 24 Fig A Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure...

Page 75: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Page 76: ...2 3 screws Secure wall with 1 2 screw into 12 wall bottom plate Fig A and top plate Fig B Secure wall to bottom plate first BEGIN 1 ENSURE PANEL CORNERS ARE FLUSH Your 1st 24 eave wall 16 is now inst...

Page 77: ...oor The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x4 x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2...

Page 78: ...4 Secure 24 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 24 wall 16 is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as s...

Page 79: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Page 80: ...from top with 2 3 nails spaced every 24 Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT Ensure all doubler seams are n...

Page 81: ...79 Please continue to the included booklet to complete your shed PART 2...

Reviews: