RECOMMENDED MAINTENANCE AND MONITORING PROGRAMME

www.BaltimoreAircoil.com
[email protected]
www.balticare.com
[email protected]

Baltimore Aircoil Int. nv
Industriepark - Zone A, 
B-2220 Heist-op-den-Berg,
Belgium

Please refer to our website
www.BaltimoreAircoil.com
for local contact details

©

Baltimore Aircoil International nv

Model: ...........................................................................................

Serialnumber: .................................................................................

Notes:
1. Water Treatment and auxiliary equipment integrated in the cooling system may require additions to the table above. Contact suppliers for

recommended actions and their required frequency.

2. Recommended service intervals are for typical installations. Different environmental conditions may dictate more frequent servicing.
3. When operating in ambient temperatures below freezing, the unit should be inspected more frequently.

Schedule

Type of Action

Action

Start-Up

Monthly

Every Six Months

Annually

Shutdown

Inspections and 
Monitoring

General condition

X

X

ICE CHILLER

® 

Tank

X

X

ICE CHILLER

®

 Water 

(1)

- Quality
- Level

X
X

X
X

Ice Thickness

X

X

Coil X

ICE LOGIC 

TM

 Ice Quantity 

controller :
- condition of sensor
- conductivity of tank water

X
X

X

Air Pump
- Air Filter Replacement

X

X

X

Refrigerant:
- Glycol quality
- NH

3

 purge oil

X
X

Air Distribution Piping

X

Cleaning procedures Mechanical cleaning

- Air filter

X

X

X

X

Disinfection X

X

X

Table 5: Recommended Maintenance & Monitoring Schedule

Summary of Contents for Ice Chiller TSC-1050C

Page 1: ...nd to assure that all necessary equipment will be available at the jobsite Be sure to have a copy of the unit certified drawing available for reference If you do not have a copy of this drawing or if...

Page 2: ...lifting when available hoisting capacity provides little margin for safety Before an actual lift is undertaken ensure no water snow ice or debris has collected in the sump or elsewhere in the unit Su...

Page 3: ...g on operating equipment be aware that some parts may have an elevated temperature Any operations on elevated level have to be executed with extra care to prevent accidents Air piping between air pump...

Page 4: ...pported on a level concrete pad After the unit is set into final position the tank bottom should be sealed airtight all around to prevent condensation formation see figure The sealer is shipped loose...

Page 5: ...ifting methods not permitted Model TSU C D L x W Dimensions Approx Shipping weight kg A mm B mm C mm TSU 95C TSU 115C 3073 x 1308 3683 x 1308 2550 2780 1597 2403 738 640 1124 1124 TSU 120C TSU 145C TS...

Page 6: ...on and corrosion REFRIGERANT CONNECTIONS ON SITE All connections in the external pipework installed by others must be leak free and tested accordingly All piping external to BAC cooling equipment must...

Page 7: ...local BAC representative 1 Non return valve 2 Steel pipe for initial 3m then PVC for remainder of air supply by others 3 Filter 4 Air pump Whenever TSC coils are to be installed in a concrete tank the...

Page 8: ...in the Operating and Maintenance Manual see Table Recommended Maintenance and Monitoring Schedule Start up must be performed Proper start up procedures and scheduled periodic maintenance will prolong...

Page 9: ...NOTES 9...

Page 10: ...10 NOTES...

Page 11: ...NOTES 11...

Page 12: ...intervals are for typical installations Different environmental conditions may dictate more frequent servicing 3 When operating in ambient temperatures below freezing the unit should be inspected mor...

Reviews: