EXF

a

Installation - Commissioning - Maintenance

20220217

Accessories

Mounting frame, EXFT1

Mounting frame for insertion mounting.

Mounting frame EXFT5

Mounting frame for fit-on mounting.

Assembly

Size of opening, see the dimensions of the connecting 
duct. Install the mounting frame by inserting its nipple 
into the connecting duct. Press the spring fasteners of the 
extract air valve into the grooves of the mounting frame 
as shown in Figure 1.

Commissioning

Rotate the inner cone clockwise (-) to increase the 
pressure drop and counterclockwise (+) to decrease it. 
Lock the position of the cone by tightening the lock nut 
on the rear side of the extract air valve.
The extract air valve can be commissioned by measuring 
the pressure or the air flow. For pressure measurement, 
use a so-called "measuring hook" (probe) and for air flow 
measurement use a commonly marketed airflow meter. 
See Figures 2 and 3.
The rated coefficient of performance (K-factor) is specified 
on the identification label of the product and in the 
relevant commissioning instructions at www.swegon.com.

Maintenance

The extract air valve can be cleaned, if necessary, using 
lukewarm water with dishwashing detergent added or by 
vacuum cleaning using a brush nozzle. The duct system 
can be reached for cleaning by withdrawing the extract 
air valve out of its mounting frame. 

Figure 1. Installation.

Figure 3. Commissioning.

p

k

p

q

=

k

p

q

=

(    )

2

EXF 125

Tomelilla

Sweden

            -10   -5    0    +5  +10

k = 2,2  3,0  3,8  4,9  5,6

k

q

q

 = measured flow l/s

p

 = current pressure reading (Pa)

k

 = commissioning factor

k-factor

Figure 2. Commissioning.