2

GENERAL INFORMATION

This bulletin only refers to the assembly of the unit. To ensure a
proper operation, a correct integration of the unit in the overall
installation is mandatory. For good engineering and application
practices on layout, levelling, connecting pipework, etc…, please
refer to our website: 

http://www.baltimoreaircoil.eu/knowledge-

center/application-information

.

BAC cooling equipment is factory assembled to assure uniform
quality and minimum field assembly.
For the dimensions and weights of a specific unit or section, refer to
the certified drawing.

When the unit is delivered to the jobsite, it should be checked
thoroughly to ensure all required items have been received and are
free of any shipping damage prior to signing the bill of lading.
The following parts should be inspected:

- Exterior panels and covers
- Ice coils
- Sight tube and Ice Logic Ice Quantity controller (optional)
- Air  pump
- Caulking material

The air pump and caulking material are shipped loose in a separate
crate.
If shipping damage has occurred, this should be clearly indicated on
the CMR.

Before rigging any BAC cooling equipment, the weight of each
section should be verified on the unit certified drawing.

Note: These weights are 

approximate

 only and should be confirmed by

weighing 

before lifting

 when available hoisting capacity provides little

margin for safety.

!

Before an actual lift is undertaken, ensure no water, snow, ice or 

debris has collected in the sump or elsewhere in the unit. Such 

accumulations will add substantially to the equipment's lifting 

weight.

About engineering and application 

practices

Shipping

Inspection before Rigging

Unit Weights

Model

TSU-C/D

Approx Shipping weight

(kg)

TSU 95C
TSU 115C

2550
2780

TSU 120C
TSU 145C
TSU 170C
TSU 200C
TSU 225C

2860
3270
3670
4220
4630

TSU 185C
TSU 230C
TSU 270C
TSU 310C
TSU 350C

4040
4630

5170

5940
6490

Table 1: Approximate Shipping weights TSU-C/D

TSU 290C
TSU 340C
TSU 400C
TSU 450C

5440
6120
7080
7760

TSU 480C
TSU 590C
TSU 700C
TSU 800C
TSU 910C
TSU 1050C

8940

10340
11660
13610
14960

17190

TSU 790D
TSU 940D
TSU 1080D
TSU 1220D
TSU 1440D

13790
15470
17920
19550
22090

Model

No° of Coils

Approx. Shipping Weight 

(kg)

TSC-95C
TSC-115C
TSC-120C
TSC-145C
TSC-170C
TSC-200C
TSC-225C

1
1
1
1
1
1
1

1065
1205
1315
1500
1635
1950
2135

TSC-185C
TSC-230C
TSC-270C
TSC-310C
TSC-350C

2
2
2
2
2

1065
1205
1340
1590
1725

TSC-290C
TSC-340C
TSC-400C
TSC-450C

2
2
2
2

1500
1635
1950
2135

TSC-480C
TSC-590C
TSC-700C
TSC-800C
TSC-910C
TSC-1050C

4
4
4
4
4
6

1365
1545
1680
2000
2180
1680

TSC-790D
TSC-940D
TSC-1080D
TSC-1220D
TSC-1440D

4
4
4
4
4

2065
2315
2720
2950
3310

Table 2: Approximate shipping weights TSC-C/D coil only

Model

TSU-C/D

Approx Shipping weight

(kg)

Table 1: Approximate Shipping weights TSU-C/D

Summary of Contents for Ice Chiller TSC-1050C

Page 1: ...nd to assure that all necessary equipment will be available at the jobsite Be sure to have a copy of the unit certified drawing available for reference If you do not have a copy of this drawing or if...

Page 2: ...lifting when available hoisting capacity provides little margin for safety Before an actual lift is undertaken ensure no water snow ice or debris has collected in the sump or elsewhere in the unit Su...

Page 3: ...g on operating equipment be aware that some parts may have an elevated temperature Any operations on elevated level have to be executed with extra care to prevent accidents Air piping between air pump...

Page 4: ...pported on a level concrete pad After the unit is set into final position the tank bottom should be sealed airtight all around to prevent condensation formation see figure The sealer is shipped loose...

Page 5: ...ifting methods not permitted Model TSU C D L x W Dimensions Approx Shipping weight kg A mm B mm C mm TSU 95C TSU 115C 3073 x 1308 3683 x 1308 2550 2780 1597 2403 738 640 1124 1124 TSU 120C TSU 145C TS...

Page 6: ...on and corrosion REFRIGERANT CONNECTIONS ON SITE All connections in the external pipework installed by others must be leak free and tested accordingly All piping external to BAC cooling equipment must...

Page 7: ...local BAC representative 1 Non return valve 2 Steel pipe for initial 3m then PVC for remainder of air supply by others 3 Filter 4 Air pump Whenever TSC coils are to be installed in a concrete tank the...

Page 8: ...in the Operating and Maintenance Manual see Table Recommended Maintenance and Monitoring Schedule Start up must be performed Proper start up procedures and scheduled periodic maintenance will prolong...

Page 9: ...NOTES 9...

Page 10: ...10 NOTES...

Page 11: ...NOTES 11...

Page 12: ...intervals are for typical installations Different environmental conditions may dictate more frequent servicing 3 When operating in ambient temperatures below freezing the unit should be inspected mor...