RIGGING

7

The standard BAC delivery consists of a centrifugal air pump (with
an inlet air filter), a threaded adaptor and a flexible discharge sleeve
to be connected to the customer provided air piping. A non-return
valve is shipped loose with the air pump for field installation.
After the unit has been rigged into position, the air pump can be
installed. The recommended air piping is shown in the figure: the air
supply is taken from the ambient air. The air pump is to be mounted
on a clean, dry and vibration free surface which is flat and will
support the unit. Special pads are not required. 
The mounting surface should be levelled and the pumps must be
securely bolted in place. It is recommended that, in case of outdoor
installation, the air pump is installed under a shelter. The air pump
should be located within 6 meters of the air distribution inlet piping.
If a more remote location of the air pump is required, consult your
local BAC representative.

 1. Non-return valve
 2. Steel pipe for initial 3m; then PVC for remainder of air supply (by others)
 3. Filter
 4. Air pump

Whenever TSC coils are to be installed in a concrete tank the
following components are provided together with the coils:

- The Ice Logic ice thickness controller: sensors are installed on

the coil, control box is shipped loose, wiring to be done on site.

- The air pump: shipped loose
- Air piping: mounted underneath the coils
- Coil supports: with sufficient height to elevate the coils above

the tank bottom in order to provide space underneath for
water distribution piping supplied by other

- Hold down channels and covers are required to prevent the

coils from floating when completely loaded with ice. These
channels and covers on top of a concrete tank are not part of
BAC’s standard supply.

Contact your BAC representative if assistance is required for the
design of these components.

 1. Concrete Tank
 2. Ice Chiller Thermal Storage Coils

Air pump installation

Installation for TSC coils only

Figure 8: Recommended air pump piping arrangement

Figure 9: Ice Chiller Thermal Storage coils only - TSC C/D 

Summary of Contents for Ice Chiller TSC-1050C

Page 1: ...nd to assure that all necessary equipment will be available at the jobsite Be sure to have a copy of the unit certified drawing available for reference If you do not have a copy of this drawing or if...

Page 2: ...lifting when available hoisting capacity provides little margin for safety Before an actual lift is undertaken ensure no water snow ice or debris has collected in the sump or elsewhere in the unit Su...

Page 3: ...g on operating equipment be aware that some parts may have an elevated temperature Any operations on elevated level have to be executed with extra care to prevent accidents Air piping between air pump...

Page 4: ...pported on a level concrete pad After the unit is set into final position the tank bottom should be sealed airtight all around to prevent condensation formation see figure The sealer is shipped loose...

Page 5: ...ifting methods not permitted Model TSU C D L x W Dimensions Approx Shipping weight kg A mm B mm C mm TSU 95C TSU 115C 3073 x 1308 3683 x 1308 2550 2780 1597 2403 738 640 1124 1124 TSU 120C TSU 145C TS...

Page 6: ...on and corrosion REFRIGERANT CONNECTIONS ON SITE All connections in the external pipework installed by others must be leak free and tested accordingly All piping external to BAC cooling equipment must...

Page 7: ...local BAC representative 1 Non return valve 2 Steel pipe for initial 3m then PVC for remainder of air supply by others 3 Filter 4 Air pump Whenever TSC coils are to be installed in a concrete tank the...

Page 8: ...in the Operating and Maintenance Manual see Table Recommended Maintenance and Monitoring Schedule Start up must be performed Proper start up procedures and scheduled periodic maintenance will prolong...

Page 9: ...NOTES 9...

Page 10: ...10 NOTES...

Page 11: ...NOTES 11...

Page 12: ...intervals are for typical installations Different environmental conditions may dictate more frequent servicing 3 When operating in ambient temperatures below freezing the unit should be inspected mor...

Reviews: