RIGGING

5

RECOMMENDED LIFTING METHOD TSU C/D

The recommended method of rigging the unit is shown in the figure.

 1. Safety slings
TSU 95C - TSU 1050C: H= 2160 mm
TSU 790D – TSU 1440D: H= 2415 mm

!

The lifting cables must be vertical in both planes as shown.

!

When lifting units as shown, some tank covers must be removed 

to provide access to the lifting ears. Ensure that the lifting cables 

do not damage the remaining covers.

Three lifting beams are required. The lifting ears and tank are not
designed to support the loads resulting from lifts employing less
than 3 lifting beams as shown in hereunder.

ROLLING INTO POSITION TSU C/D

As an alternative to lifting, the unit can be rolled into position. If
rollers are used they should be placed under the unit and must
exceed the unit width. The span between the rollers should not
exceed 1 m.

RECOMMENDED LIFTING METHOD TSC COILS ONLY

When lifting the coils, use the U-bolts provided on each corner.
Hoisting cables should be at a minimum of 45° up to maximum
vertically with the horizontal top line of the coil..

Rigging method

Figure 4: Recommended lifting method

Figure 5: Lifting methods not permitted

Model

TSU C/D

L x W

Dimensions

Approx 

Shipping 

weight (kg)

A

(mm)

B

(mm)

C

(mm)

TSU 95C
TSU 115C

3073 x 1308
3683 x 1308

2550
2780

1597
2403

738
640

1124
1124

TSU 120C
TSU 145C
TSU 170C
TSU 200C
TSU 225C

3073 x 1600
3683 x 1600
4293 x 1600
4877 x 1600
5486 x 1600

2860
3270
3670
4220
4630

1597
2403
2899
3371
3276

738
640
702
753

1105

1416
1416
1416
1416
1416

TSU 185C
TSU 230C
TSU 270C
TSU 310C
TSU 350C

3073 x 2400
3683 x 2400
4293 x 2400
4877 x 2400
5486 x 2400

4040
4630

5170

5940
6490

1597
2403
2889
3371
3276

738
640
702
753

1105

2216
2216
2216
2216
2216

TSU 290C
TSU 340C
TSU 400C
TSU 450C

3683 x 2981
4293 x 2981
4877 x 2981
5486 x 2981

5440
6120
7080

7760

2403
2889
3371
3276

640
702
753

1105

2797
2797
2797
2797

TSU 480C
TSU 590C
TSU 700C
TSU 800C
TSU 910C
TSU 1050C

6096 x 2981
7290 x 2981

85 x 29081

9703 x 2981

10922 x 2981
12725 x 2981

8940

10340
11660
13610
14960

17190

3430
4618
5889
5941
6300
6899

1333
1336
1310
1881
2311
2913

2797
2797
2797
2797
2797
2797

TSU 790D
TSU 940D
TSU 1080D
TSU 1220D
TSU 1440D

7290 x 3581
8509 x 3581
9703 x 3581

10922 x 3581
12725 x 3581

13790
15470
17920
19550
22090

4618
5889
5941
6300
6899

1336
1310
1881
2311
2913

3397
3397
3397
3397
3397

Table 3: Approximate Shipping weights TSU-C/D

Figure 6: Lifting Method for TSC coil only

Summary of Contents for Ice Chiller TSC-1050C

Page 1: ...nd to assure that all necessary equipment will be available at the jobsite Be sure to have a copy of the unit certified drawing available for reference If you do not have a copy of this drawing or if...

Page 2: ...lifting when available hoisting capacity provides little margin for safety Before an actual lift is undertaken ensure no water snow ice or debris has collected in the sump or elsewhere in the unit Su...

Page 3: ...g on operating equipment be aware that some parts may have an elevated temperature Any operations on elevated level have to be executed with extra care to prevent accidents Air piping between air pump...

Page 4: ...pported on a level concrete pad After the unit is set into final position the tank bottom should be sealed airtight all around to prevent condensation formation see figure The sealer is shipped loose...

Page 5: ...ifting methods not permitted Model TSU C D L x W Dimensions Approx Shipping weight kg A mm B mm C mm TSU 95C TSU 115C 3073 x 1308 3683 x 1308 2550 2780 1597 2403 738 640 1124 1124 TSU 120C TSU 145C TS...

Page 6: ...on and corrosion REFRIGERANT CONNECTIONS ON SITE All connections in the external pipework installed by others must be leak free and tested accordingly All piping external to BAC cooling equipment must...

Page 7: ...local BAC representative 1 Non return valve 2 Steel pipe for initial 3m then PVC for remainder of air supply by others 3 Filter 4 Air pump Whenever TSC coils are to be installed in a concrete tank the...

Page 8: ...in the Operating and Maintenance Manual see Table Recommended Maintenance and Monitoring Schedule Start up must be performed Proper start up procedures and scheduled periodic maintenance will prolong...

Page 9: ...NOTES 9...

Page 10: ...10 NOTES...

Page 11: ...NOTES 11...

Page 12: ...intervals are for typical installations Different environmental conditions may dictate more frequent servicing 3 When operating in ambient temperatures below freezing the unit should be inspected mor...

Reviews: