Initial commissioning
Section 2 – Operating Instructions
Rev. 2.8 Date 2019-02-04
Software version 1.00
CCS
Chapter 4
Page 4-7
C
OMMISSIONING LOG
Lauer Membran Wassertechnik GmbH
z
Industriegebiet Speichermatt
z
79599 Wittlingen
z
Germany
Check ring for continuity
Carried out /
OK
Left
Right
Values/data/
remarks
Line 1.1
OK
not OK
OK
not OK
Line 1.2
OK
not OK
OK
not OK
Line 2.1
OK
not OK
OK
not OK
Line 2.2
OK
not OK
OK
not OK
Line 3.1
OK
not OK
OK
not OK
Line 3.2
OK
not OK
OK
not OK
Protective conductor resistor /
electr. safety DIN EN 61010-1
test equipment number
Carried out /
OK
Values/data/remarks
NR
R V
Measured value Limit value
Measurement betw. connection cable
and housing
R
SL
<0.1
X
Measurement betw. connection cable and
mounting plate
R
SL
<0.1
X
Measurement betw. connection cable and
doors/front panel
R
SL
<0.1
X
Measurement between connection cable and
earthing connection for concentrate line
R
SL
<0.1
X
Insulation test
R
ISO
>2M
X
Leakage current
Housing leakage current normal condition
(NORMAL CONDITION)
Housing leakage current first fault
(SIGNAL FAULT)
I
GA.NC
I
GA.SF
<0.1mA
<0.5mA
X
X