
Azure Cielo Real-Time PCR Systems User Manual
Page 10
2.1—System Placement
WARNING: Excessive Weight Hazard
–
Please use two or more people to lift the system. Failure to do so
can result in system damage and personal injury.
As with all electrical instruments, the Azure Cielo should be located away from water, solvents, or corrosive
materials, on a flat and stable surface with adequate clearance on all sides. The system must remain
stationary during operation.
The system should be placed away from interfering electrical signals and magnetic fields. If possible, a
dedicated electrical outlet should be used to eliminate electrical interference from other instrumentation in
your laboratory.
The Azure Cielo should be installed at no more than 3000 meters above sea level.
2.2—System Overview
2. Installation and Setup
Figure 4. Side view of the Azure Cielo Real-Time PCR systems.
Figure 3. Front view of the Azure Cielo Real-Time PCR systems.
Touch screen panel
USB Type A port
Door
Start button with indicator LED
Open button
Figure 5. Back view of the Azure Cielo Real-Time PCR systems.
Power Switch
Power Input
USB Type A port
Ethernet port
USB Type B port