V 2 0 0 2 1 3 E N
S e i t e
21 | 27
3.
Check all electrical connections
4.
Close the housing of the inverter.
3.4.2
Kostal PLENTICORE plus
1.
In order to operate the AXIstorage Li SH system communicatively with the Kostal
PLENTICORE plus, the communication must be switched to RS485.
Disconnect the X2 plug from the BMS master (green
plug at top left)
Yellow wire must be re-pinned from PIN1 to PIN3
(RS485+)
White wire must be re-pinned from PIN2 to PIN4
(RS485-)
PIN7 and PIN8 must be bridged to activate the
RS485 communication
Plug X2 back into BMS master
2.
Preparation: Ground the AXIstorage Li SH housing:
PE
Yellow-green Connect to grounding rail
Figure 7
: Connecting the PLENTICORE plus to the AXIstorage Li SH
3.
Feed the communication cable through the respective PG screw connections into the
connection compartment of the inverter.