V 2 0 0 2 1 3 E N
S e i t e
22 | 27
4.
Connect the cables in/on the inverter according to the PLENTICORE plus operating
instructions.
Connecting battery communication cable:
white:
RS485B
yellow:
RS485A
black:
GND 0V
red:
wake-up_Bat
Figure 8:
Connection of the PLENTICORE plus - communication cable
5.
Shut the inverter down
6.
Establish DC connection:
Attach Sunclix plug accordingly
Red
(+)
(DC3 +)
Black
(-)
(DC3 -)
Figure 9:
Connection of the PLENTICORE plus - DC connection
7.
Check all electrical connections.
8.
Close the housing of the inverter.