TABLE OF CONTENTS
WARRANTY......................................................................................................................2
TECHNICAL SUPPORT...................................................................................................2
TABLE OF CONTENTS....................................................................................................3
INTRODUCTION...............................................................................................................6
SPECIFICATIONS............................................................................................................8
SPECIFICATIONS – INCLUDED TEST JIGS..................................................................9
REGULATORY NOTES..................................................................................................10
FCC PART 18........................................................................................................................10
EC DECLARATION OF CONFORMITY................................................................................10
DIRECTIVE 2011/65/EU (RoHS)..........................................................................................11
DIRECTIVE 2002/96/EC (WEEE)..........................................................................................11
FIRMWARE LICENSING.......................................................................................................12
INSTALLATION..............................................................................................................13
VISUAL CHECK....................................................................................................................13
POWER RATINGS................................................................................................................13
CONNECTION TO THE POWER SUPPLY...........................................................................13
PROTECTION FROM ELECTRIC SHOCK...........................................................................14
ENVIRONMENTAL CONDITIONS........................................................................................15
FUSES.............................................................................................................................16
AC FUSE REPLACEMENT...................................................................................................16
DC FUSE REPLACEMENT...................................................................................................17
FUSE RATINGS....................................................................................................................17
FRONT PANEL CONTROLS..........................................................................................18
REAR PANEL CONTROLS............................................................................................20
TIMING CONTROL.........................................................................................................22
MAINFRAME PULSE OUTPUT............................................................................................22
TRIGGER MODES................................................................................................................23
GATING MODES...................................................................................................................24
BASIC AMPLITUDE CONTROL....................................................................................25
SETTING THE AMPLITUDE LEVELS..................................................................................26
AMPLITUDE ACCURACY.....................................................................................................26
CURRENT MONITOR...........................................................................................................26
3
Summary of Contents for AVR-EB2A-B
Page 44: ...The installed DUT is shown below 44 ...
Page 46: ...The installed DUT is shown below 46 ...
Page 48: ...It is still below 300 ps at 10 mA 10 mA as well 48 ...
Page 56: ...PCB 158R4 LOW VOLTAGE POWER SUPPLY ...
Page 65: ...TEST JIG WIRING AVX CA AXPOST ...
Page 67: ...TEST JIG WIRING AVX CA SOD123 QTKA ...
Page 69: ...TEST JIG WIRING AVX CA SOT23B ...
Page 70: ...CUSTOMIZED DAUGHTERBOARD AVX CA SOT23B ...
Page 71: ...PERFORMANCE CHECK SHEET 71 ...