The installation of the AV-70-RF Solar Airfield Light includes the following steps:-
• Unpacking
• Initial Inspection
• Assembling the light & configuration of settings
• Installing the light assembly
Tools required for assembly & installation:-
• Large flat blade screwdriver (to suit “Flash Adjustment” Plug)
• Hammer or Sledge Hammer
• 6mm Allen Key
Unpacking Instructions
Unpack all hardware and verify container contents in accordance with Fig. 2 or Fig. 3. Please contact
your Avlite office if there is any hardware missing.
Initial Inspection
Inspect all hardware for damage. If there is any damage, please contact your Avlite Office. Retain
original packing material for possible future use in shipping the AV-70-RF.
Assembling the Light & Configuration of Settings
a. Use a large flat-blade screwdriver to remove the Flash Adjustment Plug from the base of the light
(see Figure 1).
A sealed vent on the base allows air transfer without moisture intake and should not be disturbed.
b. Setting the Light Group: Adjust Rotary Switches, A & B.
Determine, to which group, each individual light belongs. E.g., taxiway edge lights = 0, runway
edge lights = 1, obstruction lights = 2, threshold lights = 3, etc...
Adjust Rotary Switch A to the appropriate light group. E.g. 0, 1, or 2
c. Set the toggle switch to the “ON” position. This will activate the AV-70-RF.
d. To test operation of the light, the Radio Controller will need to be used (see “Using the Radio
Control to activate the ALS System” section of manual for information).
e. Replace the Flash Adjustment Plug.
f. Bolt the light into location.
1. Before activating the lights, the lights must be layed out on the runway in the
location they will be installed.
2. RF lights should always be installed on mounting plates and stakes. Avlite does