
4. Pull the required cables through the mounting arm and into the cable entry hole. Then, secure the
enclosure to the mounting arm.
Mounting the Power Supply Unit
Important:
The PSU must be mounted within a certain distance from the LPR kit. For more information, see
Maximum Cable Length
on page 10
Install the PSU within the maximum distance using the four M4 mounting holes at each corner of the unit.
Do not connect power to the PSU until all other cable connections have been established.
PSU Cable Connections
PSU to LPR Kit Connections
The HD LPR Capture Kit is powered and connected to the network through the PSU.
Mounting the Power Supply Unit
15