37
Avaya 7406E Digital Mobile Handset Installation and Configuration Guide
Chapter 3
Installing the base telephone equipment
Complete the following procedures to install the Avaya 7406E Digital Mobile Handset system
equipment:
•
Installing the handset charging cradle
•
Installing the battery pack
•
Charging the battery pack for the first time
•
Securing the base station mounting bracket
•
Connecting the telephone line and power adapter to the base station
•
Mounting the base station
Important first-time installation information
When performing the initial configurations on the handset, ensure that all the handsets you intend
to configure have fully-charged battery packs installed.
Because the handsets start scanning as soon as they are powered, you must set the handset IDs
before you configure the handset to avoid conflicts between handset signals and the possibility of
one set mirroring another.
For information on wiring your system, refer to
Appendix B, “Wiring information,” on page 55
.
Before you start
Before you install the base station, ensure that
•
the telephone lines from your system have been installed at the base station location
•
there is an ac power outlet within 1.5 meters (5 feet) of the base station location
•
you have removed the mounting bracket from the base station
Summary of Contents for 7406E
Page 6: ...6 Contents NN40110 301 NN40110 301 ...
Page 8: ...8 Task List NN40110 301 NN40110 301 ...
Page 10: ...10 Customer service NN40110 301 NN40110 301 ...
Page 14: ...14 Chapter 1 New in this release NN40110 301 NN40110 301 ...
Page 54: ...54 Appendix A DIP switch settings NN40110 301 NN40110 301 ...
Page 60: ...60 Appendix C Button mapping NN40110 301 NN40110 301 ...