Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
6
Transporting the direct shift gearbox
Special tools and workshop equipment required
♦ Workshop hoist -VAS 6100-
♦ Retainer -T10013-
Procedure
Use retainer -T10013- to transport the direct shift gearbox and
when setting up gearbox support -3282- .
– Remove threaded pin from retainer -T10013- (release retain‐
ing ring).
– Secure retainer -T10013- to gearbox lifting eye with bolt
(M8x40) -1- and washer (outside diameter 30 mm).
– Hook workshop hoist -VAS 6100- onto retainer -T10013- .
Caution
The gearbox oil cooler can be damaged when the gearbox is
transported.
♦ Guide gearbox as required when transporting.
Audi TT 2007 ➤
Direct shift gearbox 02E, front-wheel drive - Edition 12.2006
56
Rep. Gr.34 - Controls, housing