
Audi Q7 2007
!
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1 Removing and installing engine
15
6
Vehicles with air suspension:
–
Clean area around air hose connection at top of suspension
strut.
–
Remove connection piece -1- at residual pressure holding
valve -2- (you will hear air escaping).
Do not loosen or remove residual pressure holding valve.
–
Plug both connections. Make sure that no dirt particles get
into the connections.
All models:
–
Unscrew bolts -arrows- connecting transfer box to rear
propshaft.
–
Slide rear propshaft together towards rear final drive; the
constant velocity joints can be moved axially.
–
Unbolt bracket for noise insulation -arrows-.
To avoid any damage, the flexible joint at the starter catalytic
converter must not be bent more than 10
°
.
–
Disconnect exhaust system at clamp -arrow-.
Note
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259