AUTOMATIC TRANSMISSION SERVICE GROUP
Technical Service Information
112
Figure 198
Figure 197
Figure 199
Bottom Pan Components (Cont'd)
External Components
Continued on Page 113.
FINAL ASSEMBLY
FINAL ASSEMBLY
Copyright © 2003 ATSG
6262
U P
PAN BOLTS (20)
BOTTOM
PAN
PAN GASKET
Copyright © 2003 ATSG
RFF81P
-7006
-BA
Ford
98
XW4P-A
C
RJL-B
00436
1
BD-9C
17
For
d
DIGITAL TRANSMISSION
RANGE SENSOR
RETAINING
BOLTS (2)
"With"
PTO OPTION
STAMPED F81P-AA
"Without"
PTO OPTION
STAMPED F75P-BB
FORD PART NUMBER
F81Z-7A256-AA
FORD PART NUMBER
F7UZ-7A256-BB
FORD 4R100
MANUAL SHIFT LEVERS
16. Install a new pan gasket on case surface, as
shown in Figure 197.
17. Install the bottom pan on top of pan gasket, as
shown in Figure 197.
18. Install the twenty (20) pan bolts, as shown in
Figure 197, and torque all bottom pan bolts to,
14-16 N·m (10-12 ft.lb.).
19. Rotate transmission in fixture so bottom pan is
facing down, as shown in Figure 199.
1. The manual shift levers are also model sensitive
as shown in Figure 198. Ensure that you have
the proper manual shift lever for the model that
you are building.
2. Install the Digital Transmission Range (DTR)
sensor, as shown in Figure 199, install 307-351
alignment tool (or equivalent).
3. Install the two sensor retaining bolts, as shown
in Figure 199, and torque retaining bolts to,
8-10 N·m (71-88 in.lb.).
Summary of Contents for FORD 4R100
Page 118: ...AUTOMATIC TRANSMISSION SERVICE GROUP Technical Service Information 118 Copyright 2003 ATSG...
Page 119: ...AUTOMATIC TRANSMISSION SERVICE GROUP Technical Service Information 119 Copyright 2003 ATSG...
Page 120: ...AUTOMATIC TRANSMISSION SERVICE GROUP Technical Service Information 120 Copyright 2003 ATSG...