![ATS BBR3 Instruction Manual Download Page 26](http://html1.mh-extra.com/html/ats/bbr3/bbr3_instruction-manual_3005234026.webp)
MAN - BBR3 - REV: Original | D. Installation
21
Load frame hook ups pre-wired and color coded:
• RED > LVDT
• BLUE > Load Cell
• GRAY > Light
WARNING: The cable for the lights should be connected to the load frame at all times while the BBR3
is in use. The electrical grounding for the load frame to the BBR3 chassis is done through the light
cable.
1. Connect the air hose to the ports on the rear of the
load frame assembly and to the ports at the rear of
base unit. The air supply connections supply a minimum
of 60psi of clean, dry air. Make sure the location of
air hoses are such that they will not snag or catch on
anything in the surrounding environment.
2. Connect the chiller RTD cable from the rear of the
base unit to the refrigeration unit.
3. Connect the color-coded electrical cables from
the rear of the base unit to the rear of the load frame
assembly.
4. Connect the Chiller Communication Cable between
the Chiller Communication Port on the rear of the BBR3
Chassis and the RS-485 Port on the rear of the Chiller.
5. Plug the power cables from the base unit and the refrigeration unit into a surge-protected power source of
appropriate voltage. Refer to the data tag on the BBR3 base unit.
6. Connect printer if desired using the USB port located in the rear of the BBR3 base.
Figure D.11 - Load Frame Hook Ups
Figure D.12 - Chiller Communication Cable
in RS-485 Port.
Figure D.13 - Chiller Communication Cable in
BBR3 Chiller Communication Port.