16
MAN - BBR3 - REV: Original | C. System Overview
Basic Unit Controls
1. POWER INDICATOR - Orange light indicates Power is ON.
2. ZERO REGULATOR - Provides the means of lifting the loading shaft and permits the operator to adjust the air
pressure to provide a zero or preload on the specimen.
3. LOAD REGULATOR - Permits the operator to adjust the air pressure to provide a test load on the specimen
4. TOUCH SCREEN - Operator interface that allows for all setup and running of tests, all machine parameter
entries, and standardization.
5. USB PORT - Provides access for data downloads and software updates. Users may also attach a mouse and
or keyboard if desired.
Figure C.11 - Basic Unit Controls
1
2
3
4
5