www.atmos.cz
30-GB
Instruction manual - GB
GB
Boiler system with an external silo and conveyor of pellets
The length of the conveyor must
be at least 2 m so that the hose be-
tween the burner and the conveyor
can have the minimum length of 15
cm (optimal 30 - 60 cm) for safety
reasons. Maximal lenght of the hose
should not be more then 1 m.
For each conveyor a support leg is
delivered. In confined spaces we
recommend you to replace the leg
with a chain for suspending the con-
veyor from the ceiling (is part of the
conveyor delivery).
The external pellet container is de-
livered in standard sizes of 250, 500
and 1000 l. The larger the contain-
er volume, the better. For the boiler
D15P and D20P we recomand 500 l
silo. For the boiler D30P, D40P,
D50P we recomand 1000 l silo. This
size of the silos will be sufficient
for 3 to 10 days. A clearly delimited
part of the room complying with fire
regulations from which pellets may
be drawn to an intermediate storage
or directly to the boiler may also
play the role of a pellet container.
1 - Chimney
2 - Waste gas duct
3 - Boiler
4 - Burner
5 - Conveyor
6 - Silo
INFO
- We recommend you to clean the fuel container from dust and dirt that have accu-
mulated in the bottom part of the container during the heating season once a year, best after
the heating season.