Installation
38
PVL14OF-EXT
To install the jacking beam on a 4 post lift, do as followings.
• Lower the lift fully.
• Lower the jacking beam all the way
down.
• Use a proper hoist equipment to
place the jacking beam on rails
inside runways of the lift.
• Adjust the base to the correct width.
• Check to make sure that all four
rollers are seated properly on rails a
shown in the fi g.33.
• Make sure that rail channel is clean
of debris.
• Raise the lift up off the ground so that the jacking beam is off the ground.
• Check the clearance and movement of the jacking beam by sliding it
forward and rearward on the rails. Check all rollers are centered on the
rails at all points along the rail’s length. Width adjustment of the jack base
may be necessary to ensure the proper operation.
• Connect the pneumatic line following the fi g.7 and the instructions
described in the chapter 7.13.
• Connect the hydraulic hose following the fi gure 34.
• Fill the pump reservoir with the oil suggested in the chapter 5.5.
Figure 34 – Hydraulic Line Connection Of Jacking Beam