Installation
28
PVL14OF-EXT
7.9
Installation Of Front Pulleys And Cables
• Assemble the pulleys, bearings, pulley cover and other accessories into the
front beams as shown in fi g.23.
• Install each cable to the column top plate using the nuts and washers as
shown in fi g. 24.
7.10 Anchoring
Columns
• Before proceeding, install the space
bar and bolt it on the runways as
shown in fi g. 25 to help maintain
the runway spacing. Adjust
runways until the diagonals are
equal. Check the measurement
referring to the fi g.26 and make
sure to keep columns square to the
center line of lift.