Tank preparation
A watertightness test must be carried out!
The openings between the primary
settling chambers must remain.
Openings and jointing between
primary settling stage and buffer or
SBR as well as between buffer and
SBR are to be closed and sealed.
It must be ensured that an
emergency overflow (> 40 cm²) exists
between buffer and SBR tanks.
Install T-piece
for the over-
flow between
(last) primary
settling
chamber and
buffer tank as
well as for the
runout.
The level
should lie at
one height
.
For the cable
feed, plan one
(buffer and
SBR in one
tank) or two
(buffer and
SBR in
separate tanks)
openings (
≥
DN
100) per tank.