ATB AQUAMAX PRO G Operating Instructions Manual Download Page 17

Operating instructions AQUAMAX

®

 PRO G

 

ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com / 
Art.-No.: 9060 0272 / Status: 24 February 2021 / Page 17 from 36

 

cycles per day 
Central specification of the desired number of cleaning 
cycles per day. From this, the maximum cycle time 
results (see following line).  

 

info cycle duration  
Maximum duration of one complete treatment cycle. 
This time can be shortened, for example by economy 
modes or shorter clear water evacuation times. 

 
settling phase 
Duration of the sedimentation time before clear water 
evacuation takes place.  
 
flushing pulse 
Short switch-on of the pumps for the time of the 
flushing pulse (see functional description) 
 
CW evacuation 
Maximum time allowed for the clear water evacuation. 
If the lower float switch in the SBR [SW1] does not 
switch from ON to OFF during this time (display: 1 

 

0), an alarm message will be generated. 
 
SL removal 
Duration of the excess sludge removal. 
Occurs immediately after an aeration (CLASSIC, 
BASIC, PRO G) or at the end of a cycle (PRO XL). 
Only if run in phase is 0 days. 
 

CW follow-up 
For systems that are equipped with a float switch 
Aqua

Switch 

©

 (BASIC, CLASSIC) the clear water 

evacuation time will be extended for this time setting 
after reaching the minimum water level HWmin. A new 

switching operation of the float by back running water 
after completion of the pumping is prevented.. 
 
info reaction ph. 
Info duration of the treatment phase. This time is 
calculated from the previously entered settings. 
 
feed. p. cycle 
Number of the charges per cycle. The charging 
phases are divided equally between the reaction 
phases. With the feeding as well a denitrification 
phase starts. 
 
feeding duration 
Run time of the feed pump (BASIC: number of feed 
batches), based on a flow rate of 150 l/PT/d and a 
cycle duration of 8h with 3 feedings per cycle.  
 

S

S

 

 

E

E

 

 

R

R

 

 

V

V

 

 

I

I

 

 

C

C

 

 

E

E

 

 

 

 

 

 

M

M

 

 

O

O

 

 

D

D

 

 

E

E

 

 

 

Summary of Contents for AQUAMAX PRO G

Page 1: ...Innovations for clean water AQUAMAX PRO G Operating Instructions...

Page 2: ...Operating instructions AQUAMAX PRO G ATB WATER GmbH S dstra e 2 D 32457 Porta Westfalica www atbwater com Art No 9060 0272 Status 24 February 2021 Page 2 from 36...

Page 3: ...bly 11 Commissioning 12 Display information Main menu Logbook 13 Settings 15 Service mode 16 Manual mode Info Date time 21 Language Error reset 22 List of pre programmed parameters current limits 23 P...

Page 4: ...nd to malfunctions of or defects in the plant In this case every liability is excluded Modifications to the plant or unauthorised conversions are not permitted The AQUAMAX and accessories are not inte...

Page 5: ...e removed easily from the pit If the plant has to be entered then this fundamentally may take place only with the presence of a second person Particular care is to be taken The applicable accident pre...

Page 6: ...6 hours the aeration phase ends and the settling phase begins After a settling time of 1 5 hours the treated wastewater is pumped off with the clear water pump The switch off point of the pump is set...

Page 7: ...rvals and should maintained by a specialist for example twice a year Both are important for the proper operation of the systems Depending on capacity utilization the sludge is removed once a year or a...

Page 8: ...al can be extended by the CW follow up time The excess sludge removal takes place in the series PRO G during the treatment phase and in the series PRO XL after the follow up time or after the clear wa...

Page 9: ...ng takes place Flushing pulses To keep pumps free from sludge and to have a short operation during longer downtimes the charging clear water and sludge pumps are automatically switched on for the time...

Page 10: ...ne aerator and one mixer two charging two clear water pumps one sludge pump one UV disinfection plant one system for phosphate precipitation and four float switches for level indication Equipment char...

Page 11: ...The pluggable relays may have loosened during transport This must be checked before commissioning ATTENTION Before opening the proControl 2 and or the connection box these MUST be disconnected from t...

Page 12: ...important for the correct entries in the logbook Use the keys to select the type of plant and confirm with OK Use the keys to select the PT size of the plant and confirm with OK Important for the cor...

Page 13: ...d possible existing errors on the bottom line 1 for closed float switch 0 for opened float switch 1 position SW1 SBR minimum level HW min 2 position SW2 SBR maximum level HW max PRO only 3 position SW...

Page 14: ...a USB stick To do this loosen the 4 screws of the display cover not the terminal box open the cover carefully ATTENTION Connecting cable turn it over and insert the USB stick into the corresponding s...

Page 15: ...in service mode only There you will also find a description of each parameter Current limits Preset current limits A change of the default values ispossible in service mode only Alarm pause If within...

Page 16: ...with the last deni phase before the settling phase Other inputs are not checked for plausibility In this case ATB WATER GmbH excludes any warranty The individual parameters are presented to you on th...

Page 17: ...s time display 1 0 an alarm message will be generated SL removal Duration of the excess sludge removal Occurs immediately after an aeration CLASSIC BASIC PRO G or at the end of a cycle PRO XL Only if...

Page 18: ...ses for one cycle deniphase not in the XLA system Duration of the denitrification phase begins with a feeding but is independent of it deni aer ON OFF not in the XLA XLAM Setting for the intermittent...

Page 19: ...tting of these parameters is carried out in separate menu items Current limits With the current limits the allowable range between minimum and maximum current is set Current values outside of Imin Ima...

Page 20: ...e UV lamp has reached the end of its service life default setting 8000 h a warning appears on the display Please inform the maintenance company so that the lamp can be replaced during the next mainten...

Page 21: ...f a unit has triggered an error due to overcurrent consumption it can be taken into operation only after resetting this error see troubleshooting The manual mode is independent of the switching status...

Page 22: ...acknowledge the acoustic indication plus the optional alarm of the potential free contact The error message on the display will continue and will be cancelled only after deleting the error delete OK...

Page 23: ...0 10 10 10 10 10 10 10 10 10 deni aer OFF 0 120 min 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 info nitri duration calculated min 83 83 83 83 83 82 81 80 76 73 71 68 65 62 60 57 55 53 52...

Page 24: ...ages on the display acustic alarm A1 aerator 1 A2 aerator 2 mixer F1 feeding pump 1 F2 feeding pump 2 C1 clear water pump 1 C2 clear water pump 2 SL sludge pump UV UV lamp P P precipitation Under curr...

Page 25: ...ed so that the connection is broken Call service or electrician to check the contact points and the wiring The cable connection is broken See above CW timeout The clear water evacuation takes longer t...

Page 26: ...trol unit is not properly tightened so that the connection is interrupted Call service or electrician to check the contact points and the wiring The cable connection is broken See above UVS Audible al...

Page 27: ...for networking of multiple control units USB Host for software update and data exchange RS232 for remote data transmission e g via modem 2 x potential free contact max 250V AC 5A 4 x monitoring relay...

Page 28: ...DC S1 G Float switch SW1 Phase Ground S2 G Float switch SW2 Phase Ground S3 G Float switch SW3 Phase Ground S4 G Float switch SW4 Phase Ground US G UV sensor Phase Ground PL G Precipitant level contro...

Page 29: ...SB stick is inserted in the control board display screens can be saved on the stick as a screen shot in BMP format To do this loosen the 4 screws of the display cover not the terminal box open the cov...

Page 30: ...mum filling level of 70 of the useful volume Implementation of general cleaning tasks such as for example removal of deposits removal of foreign bodies Examination of the structural condition of the p...

Page 31: ...unusually high The control system indicates Flooding Alarm Unusually high infiltration inflow With heavy rainfall due to surface water or sodden earth through leaking concrete tanks Infiltration wate...

Page 32: ...e electrical unit concerned The unit or the complete AQUAMAX is not connected to the control system Connect the appropriate unit A screwed terminal in the cable distribution box or on the terminal boa...

Page 33: ...tor leaks in the tank introduction of too large quantities of cleaning or disinfection agents as well as other banned substances paints solvents etc sludge disposal not carried out incorrect setting o...

Page 34: ...ctive on machinery 2014 30 EU Directive to electromagnetic compatibility 2014 35 EU Directive to electrical equipment designed for use within certain voltage limits 305 2011 Construction products Regu...

Page 35: ......

Page 36: ...Operating Instructions AQUAMAX PRO G oCE Art No 9060 0272 Status 24 February 2021...

Reviews: