Issue 2 April 1996
GL-5
Glossary
MDF
Main distribution frame. A wiring arrangement that connects the outside
telephone lines to the internal lines. A main distribution frame can also
carry protective devices and function as a central testing point.memory
A device into which information can be copied and held and from which
information can be obtained at a later time.
MIB
Management information base.
A database of network management
information. In this book, MIB refers to the total MIB that consists of two
groups from MIB-II (an industry standard MIB) and all of the G3-MIB
developed specifically for DEFINITY G3 SNMP.
message line
A line on G3-MA screens that displays informational messages. The line
is located near the bottom of the screen, directly above the command
line.
modem
A device that converts digital data signals to analog signals for
transmission over telephone circuits. The analog signals are converted
back to the original digital signals by another modem at the other end of
the circuit.
N
network
management
system
See
NMS.
nondestruc-
tive
installation
An installation where the operating system is replaced but user files
remain untouched.
NMS
Network management system. A comprehensive system of hardware and
software used to monitor, control, and manage a communications
network. An NMS usually consists of testing devices, CRT displays and
printers, patch panels and circuitry for the diagnosis and reconfiguration
of channels.
Summary of Contents for OneVision DEFINITY G3 Guide
Page 11: ...Contents xii Issue 2 April 1996 GL Glossary GL 1 IN Index IN 1...
Page 78: ...4 18 Issue 2 April 1996 UnixWare Administration To Back Up and Restore...
Page 114: ...5 36 Issue 2 April 1996 Planning Connectivity Alarm Path 5 Proxy Agent PC...
Page 124: ...6 10 Issue 2 April 1996 Connectivity Digital Connections 5 Data module or ADU 6 Proxy Agent PC...
Page 172: ...7 24 Issue 2 April 1996 Serial I O Cards To Create Port Monitor Entries...
Page 235: ...A 4 Issue 2 April 1996 PA001 Form PA001 Administration Request Form...
Page 237: ...A 6 Issue 2 April 1996 PA001 Form PA001 Administration Request Form...
Page 243: ...Issue 2 January 1996 B 5 Design Configuration Analog On Network...
Page 245: ...Issue 2 January 1996 B 7 Design Configuration Analog On Network...
Page 247: ...Issue 2 January 1996 B 9 Design Configuration Other On Network...
Page 250: ...B 12 Issue 2 January 1996 Design Configuration Customer Provided Multiplexor Data Networks...
Page 253: ...Issue 2 January 1996 B 15 Design Configuration Customer Provided Multiplexor Data Networks...
Page 259: ...Issue 2 January 1996 B 21 Design Configuration Local Connection 5000 or Less G3rV1 V2 V3...
Page 262: ...B 24 Issue 2 January 1996 Design Configuration Remote Connection G3rV1 V2 V3...