11-2
Issue 2 April 1996
Post-Installation Tests
Technician Checklist
Technician Checklist
Introduction
The TSO representative and the technician work together to
ensure that the installation has been completed properly.
Checklist
Verify the following:
❏
The Proxy Agent is registered with the INADS
administration group.
❏
Each PBX can send alarms to the appropriate entities,
such as the
— NMS
— TSO
— Trouble Tracker
❏
Connectivity between each PBX and Proxy Agent has
been established.
❏
The Proxy Agent can receive cache data from the PBX.
❏
The NMS can retrieve configuration data from each
PBX.
❏
The TSO login and password for
root2
and
ncsc
have
been administered.
❏
The TSO System Management database has up-to-date
information about the customer contact, NMS,
processor, etc.
Summary of Contents for OneVision DEFINITY G3 Guide
Page 11: ...Contents xii Issue 2 April 1996 GL Glossary GL 1 IN Index IN 1...
Page 78: ...4 18 Issue 2 April 1996 UnixWare Administration To Back Up and Restore...
Page 114: ...5 36 Issue 2 April 1996 Planning Connectivity Alarm Path 5 Proxy Agent PC...
Page 124: ...6 10 Issue 2 April 1996 Connectivity Digital Connections 5 Data module or ADU 6 Proxy Agent PC...
Page 172: ...7 24 Issue 2 April 1996 Serial I O Cards To Create Port Monitor Entries...
Page 235: ...A 4 Issue 2 April 1996 PA001 Form PA001 Administration Request Form...
Page 237: ...A 6 Issue 2 April 1996 PA001 Form PA001 Administration Request Form...
Page 243: ...Issue 2 January 1996 B 5 Design Configuration Analog On Network...
Page 245: ...Issue 2 January 1996 B 7 Design Configuration Analog On Network...
Page 247: ...Issue 2 January 1996 B 9 Design Configuration Other On Network...
Page 250: ...B 12 Issue 2 January 1996 Design Configuration Customer Provided Multiplexor Data Networks...
Page 253: ...Issue 2 January 1996 B 15 Design Configuration Customer Provided Multiplexor Data Networks...
Page 259: ...Issue 2 January 1996 B 21 Design Configuration Local Connection 5000 or Less G3rV1 V2 V3...
Page 262: ...B 24 Issue 2 January 1996 Design Configuration Remote Connection G3rV1 V2 V3...