Installation & Servicing instructions ATAG iC-Range
79
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manufacturers instructions and the data fields on the commissioning checklist
completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually
by a Gas Safe registered engineer who has been trained on the boiler installed.
The service details should be recorded on the Benchmark Service Interval
Record and left with the householder.
*AllinstallationsinEnglandandWalesmustbenotifiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha
CompetentPersonsScheme.ABuildingRegulationsComplianceCertificatewillthenbeissuedtothecustomer.
www.centralheating.co.uk
©HeatingandHotwaterIndustryCouncil(HHIC)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failuretoinstallandcommissionaccordingtothemanufacturer’sinstructionsandcompletethisBenchmarkCommissioningChecklistwillinvalidatethe
warranty.Thisdoesnotaffectthecustomer’sstatutoryrights.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customername:
Telephonenumber:
Address:
Boilermakeandmodel:
Boilerserialnumber:
Commissionedby(PRINTNAME):
GasSaferegisternumber:
Companyname:
Telephonenumber:
Companyaddress:
Commissioningdate:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
BuildingRegulationsNotificationNumber(ifapplicable):
CONTROLS
(ticktheappropriateboxes)
Timeandtemperaturecontroltoheating
Roomthermostatandprogrammer/timer
Programmableroomthermostat
Load/weathercompensation
Optimum start control
Timeandtemperaturecontroltohotwater
Cylinderthermostatandprogrammer/timer
CombinationBoiler
Heatingzonevalves
Fitted
Notrequired
Hotwaterzonevalves
Fitted
Notrequired
Thermostaticradiatorvalves
Fitted
Notrequired
Automaticbypasstosystem
Fitted
Notrequired
Boilerinterlock
Provided
ALL SYSTEMS
ThesystemhasbeenflushedandcleanedinaccordancewithBS7593andboilermanufacturer’sinstructions
Yes
Whatsystemcleanerwasused?
Whatinhibitorwasused?
Quantitylitres
Hasaprimarywatersystemfilterbeeninstalled?
Yes
No
CENTRAL HEATING MODE
measureandrecord:
Gasrate
m³/hr
OR
ft³/hr
Burneroperatingpressure(ifapplicable)
mbar
OR
Gasinletpressure
mbar
Centralheatingflowtemperature
°C
Centralheatingreturntemperature
°C
COMBINATION BOILERS ONLY
Istheinstallationinahardwaterarea(above200ppm)?
Yes
No
Ifyes,andifrequiredbythemanufacturer,hasawaterscalereducerbeenfitted?
Yes
No
Whattypeofscalereducerhasbeenfitted?
DOMESTIC HOT WATER MODE
MeasureandRecord:
Gasrate
m³/hr
OR
ft³/hr
Burneroperatingpressure(atmaximumrate)
mbar
OR
Gasinletpressureatmaximumrate
mbar
Coldwaterinlettemperature
°C
Hotwaterhasbeencheckedatalloutlets
Yes
Temperature
°C
Waterflowrate
I/min
CONDENSING BOILERS ONLY
Thecondensatedrainhasbeeninstalledinaccordancewiththemanufacturer’sinstructionsand/orBS5546/BS6798
Yes
ALL INSTALLATIONS
Recordthefollowing:
Atmax.rate:COppm
AND
CO/CO
² Ratio
Atmin.rate:(wherepossible)COppm
AND
CO/CO
² Ratio
TheheatingandhotwatersystemcomplieswiththeappropriateBuildingRegulations
Yes
Theboilerandassociatedproductshavebeeninstalledandcommissionedinaccordancewiththemanufacturer’sinstructions
Yes
Theoperationoftheboilerandsystemcontrolshavebeendemonstratedtoandunderstoodbythecustomer
Yes
Themanufacturer’sliterature,includingBenchmarkChecklistandServiceRecord,hasbeenexplainedandleftwiththecustomer
Yes
CommissioningEngineer’sSignature
Customer’sSignature
(Toconfirmsatisfactorydemonstrationandreceiptofmanufacturer’sliterature)
www.centralheating.co.uk