Installation & Servicing instructions ATAG iC-Range
14
8.1 Wall frame
- Position the boiler frame against the wall using the template and a level.
- Use the level for horizontal positioning and checking the vertical position.
- Drill 4x ø10mm holes, 60mm deep
- Press the nylon wall plug (ø10x55mm) in the holes
- Mount the boiler frame to wall with the 4 coach screws (ø8x60mm) using a 13mm wrench
The boiler frame allows pipe work to be installed behind the boiler.
Note that there are free spaces on the left and right of the expansion vessel. Do not guide pipe work
in front of the expansion vessel. The pipe work must be installed at least 10mm inside the front of the
frame.
ATAG i-Serie template and iC-Range boiler frame
Figure
8.1.a
NO PIPING IN THIS AREA
TO AVOID OBSTRUCTIONS
44866920 C60708C
EXPANSION VESSEL HOSE PASSAGE
55 mm
= 395 mm =
= 380 mm =
65 mm
100 mm
635 mm
699 mm
= 440 mm =
65 mm
40 mm
65 mm
95 mm
440
225
355
700
2.5 mm
MINIMAL SIDE CLEARANCE
2.5 mm
MINIMAL SIDE CLEARANCE
210 mm
MINIMAL TOP CLEARANCE FOR 60/100 FLUEGAS BEND
135 mm
MINIMAL BOTTOM CLEARANCE WITH ECONOMISER
100 mm
MINIMAL BOTTOM CLEARANCE
WITHOUT ECONOMISER
3
EL
G
NA
E
PI
P
SA
GE
UL
F
125 mm HOLE
FOR 60/100 FLUEGAS PIPE
120
BACK EXIT FLUE PIPE HEIGHT
FOR 60/100 FLUEGAS PIPE
121
SIDE EXIT FLUE PIPE HEIGHT FOR 60/100 FLUEGAS PIPE
15 m : i24C/i28C iC Economiser 27 Plus i15R/i18R/i24R i15S/i18S/i24S
9 m : i36C/i40C i32R/i40R i32S/i40S
Elbow or
vertical adapter
225mm
121mm
8 m : iC Economiser 35 Plus/Economiser 39 Plus
330mm
435mm
540mm
645mm
749mm
854mm
2 m
4 m
6 m
8 m
10 m
12 m
14 m
3
Maximum straight length for Ø60/100:
173mm
1 m
= free space for piping