ASTi Telestra 4 Training Manual (Ver. 1, Rev. F)
18
Copyright © 2010 Advanced Simulation Technology inc.
4.0. Telestra 4 Concepts
4.1. The Flow of Data
The Telestra 4 concepts are very fundamental in understanding how the applications work
together. Simply put, the project containing all model data and system configuration resides on
the Target and is manipulated using ACE Studio software. The complicated part is understanding
the break down of information flowing between real-time and non-real-time. The diagram below
displays the general flow of information from the Studio to the Target over the network.
Target
Studio
T4 Architecture - The Flow
Development System & the Target
Network
Project Manager
Load Viewer
Projects
Load
1) Open Project on Dev. System locally
2) Execute / Install Layout
3) Open Load in Load/Model Viewer
4) Edit/Add/Delete comps in Load in RT
5) Save locally in Project Manager
6) Save Project on Target Repository
S-expression
Notes
-Repository is where Projects are stored
-Load in Real-time
-Project Manager only stores local copy until saved
Non-
Real-time
Real-time
Project 1 = Repository 1
Project 2 = Repository 2
“ ”
“ ”
Project N = Repository N
Load saved
locally in
Project Manager
Figure 17: The Flow of Data