V4.4 03/08/18
TD0036
Page 2 of 39
This Document is uncontrolled when printed unless over stamped “CONTROLLED DOCUMENT”
VERSION HISTORY
Version
Date
Who
Description of Changes
Approved By
1.0
01/10/12 AK
Initial version of document.
1.1
02/10/12 AK
Added notes on removing the strip frame.
2.0
09/01/13 AK
Various Topics changed.
3.0
26/01/15 AK
Updated to reflect the pod changes, new system dimensions
and new iMX28 PCB.
3.1
27/04/15 AK
Added section on extension systems. Changed general
document layout.
3.2
22/10/15 LN
Updates to reflect system design changes. Updated Battery
Connection Details section. Rewritten to match current
installation process.
3.3
23/06/16 LN
Added detail on tamper switch and door lock connections for
extension systems – sections 4, 6.1 and 6.6.
3.4
12/07/16 LN
Updated ‘What You Should Have’ and ‘Connecting Extension
Cabinets’ sections to include more detail for extension systems.
3.5
21/07/16 RC
Document changed from UD0049 to TD0036
3.6
07/09/16 LN
Added to notes on ‘Extension Systems Overview’ and
‘Connecting Extension Cabinets’ sections to include more detail
on tamper switch connection/Interface PCB versions.
MT
3.7
21/11/16 RC
Added UL Certification information to the introduction
3.8
12/04/17 LN
Added ‘Product Details’ section with compliance and electrical
details. Added ‘Mounting Info & Safety Tips’ section. Added
‘Product Disconnection’ section. Updated the ‘Connecting the
Mains Power’ section. Added ‘Replacing the Fuse in a Surge
Protection Device’ section. Added ‘Switching off the System’
section.
MW
3.9
19/04/17 LN
Edited a note in ‘Connecting the Mains Power’ section.
4.0
05/06/17 LN
Moved mains and network cable routing details into a new
section ‘Routing the Mains and Network Cables’ and added
detail for cable management.
4.1
06/12/17 RC
Added ferrite core installation process
4.2
07/12/17 RC
Update information from UL testing
4.3
08/05/18 JO
General updates
4.4
03/08/18 JO
Knock out dimensions added