15
80-0180-339, Rev 2
Connector Signal Descriptions
The following are the connector signal descriptions:
Connector
Pin
Description
J1
Battery
Backup
1
Power In
24VDC returned from battery charging system
2
Power Out
24VDC supplied to battery charging system
3
Ground
Includes Earth ground and Exit Device green wire
J3
Field Wiring
1&2
Input #2: Normally open activation switch
3&4
Input #1: Normally open activation switch
5
Exit Device #2
6
Exit Device #2, + 24 VDC
7
Exit Device #1
8
Exit Device #1, + 24 VDC
9
Fire Relay
10
Fire Relay
J4
Main Power
L
The Main Power live/hot input.
N
The Main Power neutral/return input (white
conductor).
Green Earth
Ground
Connected to PS-SE enclosure and to local earth
ground; and connected to SE bar and local earth
ground
SE Exit Device Configuration
1. PERFORM the calibration process for the installed exit device.
a. ENSURE power is disconnected.
b.
IF
printed circuit board assembly (PCBA) is being replaced,
THEN
INSTALL new PCBA.
c. DEPRESS the push bar fully.
d. APPLY 24 VDC power to the exit device.
e. CONTINUE to hold the push bar until an audible activation sound
is heard from the motor, and then RELEASE the push bar to its
latched position.
NOTE:
The push bar cover must be in place for at least 8 seconds for
a complete calibration cycle to occur.
f.
IF
the calibration process does not complete successfully,
THEN
REPEAT Steps [a]
– [e].