700002-Rev N 09/18
®
5800 ADAEZ PRO
Installation and Operation Instructions
22 of 50
On an aluminum storefront door, the operator mounting
holes must
not
be drilled into the top rail web, rail-to-
stile tie rod(s), or the rail-to-stile junction.
•
Do not
drill into the top rail web
•
Do not
drill into the rail-to-stile junction
2. DETERMINE the type of mounting hinge (butt,
continuous, or offset).
NOTE:
A
pull-mount operator
always mounts on the
outside (pull-to-open) of the door at the hinge or pivot
edge of the top rail.
•
Do not
drill into the rail-to-stile tie rod(s)
The template provides for Right Hand door mounting
on one side and Left Hand door mounting on the
opposite side. The template provides 6 mounting hole
locations for the operator bracket. A minimum of 4
locations must be used. Select the 4 mounting holes
that will not interfere with a top rail web, rail-to-stile tie
rod(s), or the rail-to-stile junction.
3. If door is an aluminum storefront door, EXAMINE
top rail, and, when drilling mounting holes,
ENSURE the following:
1. SELECT the right hand or left hand side of the
operator mounting template as applicable. Refer to
Figure 18.
CAUTION
Operator And Door Arm Installation Instructions - Pull Side Applications
7
Figure 18