1. Refer to Figure 13, and DETERMINE the proper
operator mounting bracket location.
2. If the door is aluminum rivnuts must be installed,
PERFORM the following:
3. Using the provided rivnut installation tool, INSTALL
the ¼-20 steel rivnuts.
NOTE:
For light duty or hollow-core doors with
insufficient top rail blocking, through bolts or sex nut
and bolts are required to securely attached the
operator mounting bracket.
• Using a 25/64
″
drill, DRILL the operator
mounting bracket holes.
700002-Rev N 09/18
®
5800 ADAEZ PRO
Installation and Operation Instructions
17 of 50
Installing the Operator Mounting Bracket
Operator And Door Arm Installation Instructions - Push Side Applications
6
Figure 13
1/2”
1-1/8”
1-3/4”
2-3/8”
MOUNT POSTS
IN LOWER POSITION
MOUNT POSTS
IN UPPER POSITION
NARR
O
W
T
OP RAIL
ALL O
THERS
(MEDIUM,
LARGE,
SOLID DOOR)