System setup
31 / 49
The central meter will then also automatically be added to the "Power Meter" screenlet and
other relevant applications.
6.2.8.2. Pairing a central meter in the WebView
1. Go to WebView > Appliances > Central Meters
2. Click on "Detect". The scanning might take a few moments.
3. Once a new central power meter is found, you will get a notification pop-up, identifying the
meter and asking if you want to use it. Press OK.
4. The meter has now been saved and you are redirected to the Central Power Meter screen. Fill
in a name for the central meter, and other details if necessary.
5. The settings will automatically be saved when you navigate away from this page. The central
meter will then also automatically be added to the "Power Meter" screenlet and other relevant
applications.
6.3. Actions
6.3.1. Themes
Themes are programmed sequences of actions, such as turning ON or turning OFF an appliance,
that you can control with one button. You can program these sequences yourself. For example,
you can combine all the appliances of one room to one Theme, and shut them all off in one go.
Each Theme comprises a number of steps. Themes cannot be turned ON or OFF, they simply run.
When a theme is run the steps are executed in order. Consequently, to have the possibility to
e.g. turn a set of appliances ON or OFF with themes, you would define two themes, one of ON,
one for OFF.
Important
E
Each Asema E has three "pipelines" that run home automation features. A theme reserves
one pipeline when it runs. If you add long delays in the theme, the pipeline will wait for
that delay to pass before releasing the pipeline for other processing. If you run multiple
themes with delays, once all three pipelines are waiting, the rest of automation will wait
for the pipelines to be freed. So you can momentarily "freeze" the system if you employ
delays carelessly.
6.3.1.1. Defining a theme on the Device
1. Go to Main Setup > Actions > Themes
2. Click "Add". This will open up a form. Give the theme step sequence a name.
3. Then add one or more steps at the bottom into a sequence:
• +item = add an appliance or controller
• +delay = add a delay between two steps