ELECTRICAL INSTALLATION, cont.
Prepare the power cables by removing approximately 6” of the outer cable insulation (in the case
of SO type portable cables). Strip the insulation back exposing the appropriate amount of the bare
conductor for the chosen 3/8” ring terminals, and for all input, output, and grounding conductors.
Insert the prepared cables and strain relief assemblies into the prepared holes in the cable access
cover. Insert the terminated wire ends into the appropriate input/output terminal block and
tighten. Replace the power cable access cover and front panel using the removed hardware.
FIGURE 4 INPUT AND OUTPUT CONNECTIONS
Summary of Contents for AC100Q-3
Page 15: ...AC100Q 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE ...
Page 16: ...AC100Q 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 MECHANICAL OUTLINE ...
Page 38: ...AC100Q 3 Operations Manual 38 This page intentionally left blank ...
Page 55: ...AC100Q 3 Operations Manual 55 FIGURE 8 STATUS WORD BIT DEFINITIONS ...