
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual....
49
7.3
LOAD MANAGEMENT OPERATION, cont.
7.3.5 Quick Setup of Shore Cord Alarm
, Single, Master, or Slave Converters
1. Turn on the red Disconnect switch of both converters and wait 15-20 seconds for initialization.
2. Press the
SHORE POWER
+
F2
buttons on both converters.
3. Press the Cursor (
F4
) button to advance to the ALARM AT % setting.
4. Set the converter ALARM AT % using the More/Less (
F1
/
F2
) buttons.
5. Press the Cursor (
F4
) button to advance to the ALARM enable setting.
6. Set the converter ALARM enable using the Enable/Disable (
F1
/
F2
) buttons.
7. Press the Exit (
F5
) button to save the settings and exit.
8. Turn on the converters and place online as usual. Alarm will occur when loading reaches the
ALARM AT % setting.
Summary of Contents for AC100LC-3
Page 42: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 42 This page intentionally left blank ...
Page 62: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 62 11 MSDS SHEET COOLANT OIL ...
Page 63: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 63 11 MSDS SHEET COOLANT OIL cont ...
Page 64: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 64 11 MSDS SHEET COOLANT OIL cont ...
Page 65: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 65 11 MSDS SHEET COOLANT OIL cont ...
Page 66: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 66 11 MSDS SHEET COOLANT OIL cont ...
Page 67: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 67 11 MSDS SHEET COOLANT OIL cont ...
Page 68: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 68 11 MSDS SHEET COOLANT OIL cont ...