AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual....
21
5.3
ELECTRICAL INSTALLATION
This procedure assumes the physical installation of the converter has been completed.
It is the installer’s responsibility to provide input service over-current protection and disconnect
means.
It is recommended that connection be made to the distribution bus through a manually operated
disconnect device such as a molded case switch or circuit breaker (rated for the total system
amperage) to ease disconnection and provide a safe servicing environment in the event of converter
failure.
Follow the table below when considering shore power input cabling.
MAXIMUM CURRENTS UNDER LOW-LINE CONDITIONS:
Model
AC90LC-3
AC100LC-3
AC125LC-3
Input Current @ Three-Phase,
150A
166A
193A
330-520VAC
MAXIMUM OUTPUT CURRENTS: Refer to Table 1, page 12
All power wiring requires the removal of the front panel and cable safety cover. The front cover is
secured with 6 ea #10 stainless steel screws.
Re-install the front panel using the removed hardware. Place the disconnect switch in the OFF
position.
Summary of Contents for AC100LC-3
Page 42: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 42 This page intentionally left blank ...
Page 62: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 62 11 MSDS SHEET COOLANT OIL ...
Page 63: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 63 11 MSDS SHEET COOLANT OIL cont ...
Page 64: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 64 11 MSDS SHEET COOLANT OIL cont ...
Page 65: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 65 11 MSDS SHEET COOLANT OIL cont ...
Page 66: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 66 11 MSDS SHEET COOLANT OIL cont ...
Page 67: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 67 11 MSDS SHEET COOLANT OIL cont ...
Page 68: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 68 11 MSDS SHEET COOLANT OIL cont ...