AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual....
23
5.3
ELECTRICAL INSTALLATION, cont.
Prepare the power cables by removing approximately 6” of the outer cable insulation (in the case of
SO type portable cables). Strip the insulation back exposing the appropriate amount of the bare
conductor for the chosen 3/8” ring terminals, and for all input, output, and grounding conductors.
Insert the prepared cables and strain relief assemblies into the prepared holes in the cable access
cover. Insert the terminated wire ends into the appropriate input/output terminal block and tighten.
Replace the power cable access cover and front panel using the removed hardware.
FIGURE 7 INPUT AND OUTPUT CONNECTIONS
Summary of Contents for AC100LC-3
Page 42: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 42 This page intentionally left blank ...
Page 62: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 62 11 MSDS SHEET COOLANT OIL ...
Page 63: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 63 11 MSDS SHEET COOLANT OIL cont ...
Page 64: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 64 11 MSDS SHEET COOLANT OIL cont ...
Page 65: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 65 11 MSDS SHEET COOLANT OIL cont ...
Page 66: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 66 11 MSDS SHEET COOLANT OIL cont ...
Page 67: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 67 11 MSDS SHEET COOLANT OIL cont ...
Page 68: ...AC90LC 3 AC100LC 3 and AC125LC 3 Operations Manual 68 11 MSDS SHEET COOLANT OIL cont ...