![ASCOM OFFICE 45 - Operating Instructions Manual Download Page 65](http://html1.mh-extra.com/html/ascom/office-45/office-45_operating-instructions-manual_2981451065.webp)
Installation and First-Time Operation
20321625en_ba_a0
65
Installation and First-Time Operation
Putting Your Phone into Operation
Note: Phone plug designs vary from country to country.
Logging your phone on
Your system administrator has to prepare the system before you can log on your phone.
Attaching the handset cradle to the phone
1. Attach the handset cradle on the left-hand side of the phone. To do so, push the two attachment tabs
into the attachment tab slots on the handset cradle until you feel them click into place.
2. Fit the projecting extremities of the attachment tabs into the attachment tab slots of the phone and
carefully push both elements together.
Connecting your handset to the phone
1. Plug the connector at the rippled end of the handset cord into the socket near the handset's micro-
phone.
2. Plug the connector at the loose end of the cord into the small socket on the underside of the phone.
Connecting your phone to the system
1. Plug the connector on the phone cord on the underside of the phone into the socket with the phone
symbol.
2. Feed the cable through the strain relief device.
3. Plug the other end of the cable into the phone socket outlet.
All manuals and user guides at all-guides.com