INSTALLATION
Copyright 2001
3-3
DAC128V HARDWARE REFERENCE
Referring to the appropriate figures and tables described above, perform the following
steps. The asterisk (*) denotes optional items.
1.
Turn off all power to the host system.
2.
Remove the target IP Module carrier and move it to the ESD controlled area
where the installation of the DAC128V can be made.
3.
Remove the DAC128V from the shipping package and place it on the ESD
bench.
4.
Install the DAC128V onto the carrier board by applying adequate and equal
pressure to the DAC128V board at both ends.
* 5.
Install four M2x5 mm flat head machine screws onto the IP Module carrier’s
IP Module connectors.
This completes the installation of the DAC128V to the carrier board.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for DAC128V
Page 3: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 37: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 41: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 47: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 55: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 59: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...