Hardware Preparation and Installation
SharpSwitch™ PCIE-9205 Installation and Use (6806800U18D
)
36
3. Remove the desiccant bag shipped with the card and dispose it according to your
country’s legislation.
2.2
Environmental, Thermal, and Power
Requirements
This section contains the environmental, thermal, and power requirements of the PCIE-9205
card.
2.2.1
Environmental and Thermal Requirements
Make sure the card is thoroughly inspected before shipment. If any damage has occurred
during transportation please contact our Contact Center immediately.
Operating temperatures refer to the temperature of the incoming air passing across
the card and out of the faceplate and not the temperature of the components.
Card Damage
High humidity and condensation on the card surface causes short circuits.
Do not operate the card outside the specified environmental limits. Make sure that the
card is completely dry and there is no moisture on its surface before applying power.
Summary of Contents for SharpSwitch PCIE-9205
Page 1: ...SharpSwitch PCIE 9205 Installation and Use P N 6806800U18D March 2018 ...
Page 6: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 6 Contents ...
Page 8: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 8 List of Tables ...
Page 10: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D 10 List of Figures ...
Page 22: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D Safety Notes 22 ...
Page 30: ...SharpSwitch PCIE 9205 Installation and Use 6806800U18D Sicherheitshinweise 30 ...
Page 62: ...Controls Indicators and Connectors SharpSwitch PCIE 9205 Installation and Use 6806800U18D 62 ...
Page 68: ...Functional Description SharpSwitch PCIE 9205 Installation and Use 6806800U18D 68 ...
Page 86: ...BIOS SharpSwitch PCIE 9205 Installation and Use 6806800U18D 86 ...
Page 101: ......